- Size:1DVD
- Language:english
- Platform:Win7/WIN10
- Freshtime:2024-02-16
- Search:GEOVIA Surpac 2023 crack GEOVIA Surpac 2023 download GEOVIA Surpac 2023 training
Description
GEOVIA Surpac provides mining companies with the powerful, reliable, and customizable 3D mine planning and geological modelling software they need to deliver advanced drillhole-data management, perform rigorous statistical and geostatistical analyses, and develop comprehensive resource models, mine designs, and mine plans for either open pit or underground operations.
With Surpac, geologists can quantify and evaluate the physical characteristics of a deposit, even with limited information. Engineers can visualize mine designs and plans that maximize ore recovery while complying with project constraints. Mine production teams can integrate vast amounts of data to determine the best way to extract reserves.
Block Modeler
Analyze the spatial variability of earth characteristics and create regularized volumetric models of the combined set of characteristics. Perform bench based block grade control calculations for open cut operations.
- Calculate volume and quality of materials within extents of an area under investigation
- Create reports of any geological object according to international standards
- Generate volumetric block models & perform geostatistical analysis
- Evaluate mineral resources
- Produce outputs for regulatory reports and investment feasibility decisions
Surveyor
Generate the daily survey requirements for the mine site by integrating and processing survey data from CMS, GPS and other traditional survey instrumentation, and update as-built mine geometry from reduced survey data.
- Calculate total material handled, rehandled or filled
- Set out or delineate locations and boundaries
- Ensure compliance with survey‑related regulation or legislation
- Publish the following measured survey data for use in the mining production process:
- Survey control stations and reduced pickups
- Mining infrastructure (buildings, roads, processing plants, etc.)
- As-built maps of the mine, compared to the design
- Monthly volumes mined/filled and broken (reconciliation)